Air Conditioning installation Mackay Emmanuel School, Climate Air Solutions recently supplied and installed 3 Panasonic 5Kw reverse cycle inverter split systems to the “Emmanuel primary school” tuck shop. Emmanuel primary school had decided it was time to refurbish their tuck shop and upgrade the Air Conditioning. Climate Air solutions worked along side John Foster Project Builders for this particular job. The job was done in 2 stages. The first stage having Air Conditioning pipe and condensate drains ran to locations marked on plans. The second stage having the 5kw Panasonic Air Conditioner installed. Climate Air Solutions was required to install steel safety cages over the outdoor Air Conditioning condensors to prevent students from any unforeseen injuries. Once the job was completed, Emmanuel primary we very satisfied with the quality of work that was carried out on this job.